Business Scope

Current Location:

Power Transmission and Substation

With original value of fixed asset of RMB 89 million Yuan, technical equipment rate of RMB 11450 Yuan/person, machinery power  rate of 10.3 kW/person, and four traction & tension facilities, the Power Transmission and Transformation Division has the qualification of implementing the transmission line and substation projects of various voltage levels on EPC basis. The Division has the capacity of laying 2500 km transmission lines of 220kV to 1000kV and building 10,000 MVA substations per year. Meanwhile, the business of this Division covers independent project management of transmission & transformation projects, installation of equipment, commissioning, manufacturing of transmission towers and hardware, etc.

Since the establishment, the Transmission and Transformation Division has completed or is building 11 transmission lines of 13.8kv to 800kv with a length of 1865km, and 114 substations with capacity of 16430 MVA. The construction sites include 16 provinces and autonomous regions in China, Pakistan, Brazil, Ecuador etc. Among these projects, the Brazil Belo Monte 800kV UHVDC transmission line is the first UHV transmission line in Brazil and the fourth in the world.

Produced By 大汉网络 大汉版通发布系统